New AOV Installation at Vista – Poole

ACS has successfully completed a new AOV installation at ‘Vista’ in Poole on behalf of AHH Group. The design consisted of three independent smoke shafts which required a comprehensive CFD analysis to prove the effectiveness of the ventilation strategy. By applying the CFD results, we were able to provide a substantial cost saving to the client.